1. Contractor is responsible for all measurements. 2. All surfaces must be cleaned and prepped to receive finish paint. Preparation of all surfaces shall be done to industry standards and to paint manufacturer’s instructions. 3. Apply two coats of paint on all interior surfaces that currently have an existing painted finish: walls, doors, jambs, ceilings, partitions, floors, and trim. 4. Paint shall be Promar 200 by Sherwin Williams or equal. All walls, doors, jambs, trim and partitions shall have a semi-gloss sheen. The ceiling shall have an eggshell sheen. 5. Prep the floors as required by the manufactured instructions and apply two coats of Sherwin Williams ArmorSeal 1000 HS Epoxy (Part A). 6. All paint colors will be selected from the manufacturer’s standard colors. 7. Remove and replace the metal push and pulls on the restroom doors. Replace with new 4” x 16” push plate and a through bolted 4” x 16” pull plate both in stainless steel. 8. Provide and install a 18” x 24” stainless steel framed mirror over the sink in the Men’s room. 9. Install a sign on the Women’s door that indicates that there is a baby changing station located inside. 10. Remove and reinstall the sink in the Men’s room. Replace the faucet knobs with levers.