Project scope of work includes the following approximate quantities: 7053 SY Remove Concrete Pavement, 1615 SF Remove Driveway, 3571 SF Remove Asphalt Bikepath, 1636 SF Remove Concrete Bikepath, 334 SF Remove Sidewalk, 2 EA Remove Manhole, 3 EA Remove/Relay RCP Apron, 3 EA Remove Catch Basin, 308 LF Remove Existing Pipe, 1313 CY Common Excavation, 1570 CY Embankment Material In Place, 1507 CY Granular Material for Base, 408 SY Erosion Control Blanket, 5913 SY Concrete Pavement (8”), 4310 LF Joint Sealing, 1493 SY 8” Reinforced Pavement, 4205 SY Geotextile Fabric, 447 LF of 12” 15” 30” 54” & 72” RCP Class III, 14 LF 48” Manhole, 30 LF 30” Standard Catch Basin, 320 LF 4” PVC Underdrain with Sock, 62 CY Riprap Grade l, 281 SF 4” Concrete Sidewalk, 4905 SF Concrete Bikepath (10’ Wide), 1536 SF 6” Reinforced Driveway, and Other Miscellaneous Work Items.