A. Furnish all labor, materials and other services required to give the new spaces a thorough cleaning in preparation for occupancy on or before the Owner takes occupancy of the building. Carefully note that this specification applies to all sections of the building completed by the contractor prior to occupancy by the Owner at the completion of the project, no later than August 29, 2025. The use of a professional cleaning service is strongly advocated. B. Cleaning shall consist of, but is not limited to, the items below: 1. All accumulated rubbish shall be removed from the building and points immediately adjacent thereto and removed from the site. 2. Give the entire project a thorough cleaning at the completion of all other work but before the glass is cleaned. 3. Remove all temporary protections. Clean and polish all affected floors at completion. 4. Clean all fixtures and equipment, remove all stains, paint, dirt and dust. 5. Thoroughly wash and clean all dirt and stains on all exterior vertical and horizontal surfaces affected by this contract. 6. Leave the final renovated area clean no later than two weeks prior to Substantial Completion. If the Contractor fails to demonstrate a commitment to accomplish the required cleaning in adequate time for reoccupancy, the Owner reserves the right to employ a professional cleaning service and to deduct the cost thereof from the Contract for Construction.