General Chassis & Implement Maintenance, Repair, and Annual Inspections and Certification of Articulating Boom, Bucket Truck and Mobile Elevated Work Platform (MEWP) Units in Service at Cleveland Hopkins International Airport Including But Not Limited To: Unit 1: 2012 Ford F-550 with 2008 Hi Ranger TL 40 P Unit 2: 2003 Sterling with Elliot model ECG-4-85-H Boom Vendor Should Have Experience Operating, Repairing and Maintaining Chassis-Mounted & Articulating Boom Equipment Including But Not Limited to the Following Lift & Vehicle Components: Fluid Levels; Leaks, Wheels and Tires; Batteries and Charging; Upper and Lower Controls; Steering and Brakes; Personal Protective Devices; Hydraulic; Air, Fuel and Electrical Systems; Fiberglass and Insulating Components; Winches; Jibs; Placards and Related Markings; Mechanical Fasteners and Pins, Cable and Wiring; Outriggers and Stabilizers and Guardrail Systems. Inspection: Vendor Can Perform Annual Inspection As Required by A92.5 Section 6.7 and A92.6 Section of the ANSI/SIA Standards. These Inspections Are Carried Out According to ANSI Standards and Manufacturers Guidelines and Include But Are Not Limited to Load, Stability and Dielectric/Insulating Testing As Well As Visual Inspection.