Excavate the ¾ waterlines about 4-8 feet from the meter pit. We want to tie on to the line but not off the meter. The water line is currently feeding a hydrant that gets shut off in the winter. After locating the water line, we would like to have ¾ curb stop and curb box installed. After the curb stop is installed, we will need the box backfilled and rough graded. Product specifications include items such as: ¾ Curb stop box and curb stop. The work can begin as soon as possible and must be completed on site by June 30, 2025. Work should be completed during the hours 8am-4pm Monday thru Friday. The State’s water department would like to be on site on the day of construction. Work will need to be scheduled through the park manager. All trash should be hauled away, however, there shouldn’t be any demo. No permits required. The vendor is responsible for supplying all materials needed for the service. Shipping costs must be included in the cost of the item.