KITCHEN: 12 LF: Base Kitchen Cabinets/Replace/ Prefinished Oak. Replace Base Cabinets, Includes, door and drawer pulls. Replace all of the kitchen base cabinets, set level and square. Countertop/New/Post Form Top. Install new countertop and backsplash. Replace the cabinet countertop. Provide the home owner with color samples for selection. EXTERIOR: 1 Ea Door/Exterior/Half-Glass/Pre-Hung Steel/. Replace exterior entrance door with new pre-hung two panel with 1/2 glass with Mini Blinds between the glass. Work shall include paint-both sides, lockset, deadbolt & peephole. 100 LF Handrail/Wood/Install. Install new porch handrail with balusters. Balusters Repair: drill and screw all of the existing balusters to the handrails. Replace any damaged units.