The project includes: • Furnish, install, and remove temporary traffic control and erosion control measures. • Cold plane approximately 27,300 square yards of asphalt concrete roadway. • Construct approximately 5,940 Tons of Asphalt Concrete Pavement (ACP). • Construct approximately 440 cubic yards of aggregate roadway and concrete flatwork base material. • Construct twenty-five (25) new concrete curb ramps, complete with adjoining curbs and sidewalk. • Construct approximately 3,960 square feet of new concrete sidewalk. • Complete manhole and other structure grade adjustments. • Restore roadway signing and permanent pavement markings. • Install conduit, junction boxes, and illumination foundations for five (5) new streetlights. • Remove four (4) existing streetlights and foundations. • Install radar signal detection for the South 2nd Street leg of the OR99E / South 2nd Street traffic signal.