Morrow County, Oregon, requests proposals for a qualified Contractor to re-build the north side of the arena wall with Marine grade plywood. This plywood will need to be primed and painted (gray) and secured to the panels (painted white). Structural support will need to be added ½ way down the wall as a 9’ archway from the ground. A continuous fence will need to be completed by the catch pens on the east side of the arena. Painting panels (white) that the plywood hangs by and new fencing construction. An additional paint job can be itemized in the quote to include painting all panels in the arena. Strapping and securing tin, or metal to the lower foot of the plywood will need to be done. The bottom of the arena wall must be buried into the ground 4 to 6 inches. Contractors submitting qualifications shall be considered based upon the following general evaluation criteria: