• Civil site work and exterior improvements. o Landscape and Irrigation scope to follow basis of design documents. • Masonry o The building will be of concrete block construction on concrete footings and slab. • Structural Steel o Roof structure and crane rails • Roofing and guardrails • Plumbing for restroom and service plumbing, including industrial pipe fitting and all services required to complete this scope. • Fire sprinklers, alarms and access controls. • HVAC/Mechanical o A portion of the slab will house the chimney/stack and dust collector/baghouse equipment. See Exhibits. o Custom 18’x18’ hood over open burn area o Building Automated Systems (BAS) o Owner will contract separately for necessary commissioning work. • New service electrical will be required o Talks with PPL (utility provider) are ongoing • Appropriate exhaust for the furnace and other safety systems. • Custom Hydraulic Tilting Type Fire Resistance Test Furnace will be owner supplied and Contractor installed. Furnace will be delivered to site and accompanied by service technicians, for a limited time, to oversee installation, testing and training. GC is responsible for collaborating and coordinating install. Furnace manufacturer will not install. See Exhibits. • Low-voltage data/telecom and horizontal cabling. • All surveys, geo-testing, commissioning, special inspections and permit fees will be carried by OSU.