id Item Paragraph Description Quantity Unit Price Subtotal Price 1 A Mobilization Lump Sum 1 Lump Sum 2 B Clearing and Removal of Obstructions Lump Sum 1 Lump Sum 3 C Rock Excavation-Stipulated Price Cubic Yard 20 $200.00 Cubic Yard $4,000.00 4 D Foundation Material Cubic Yard 50 Cubic Yard 5 E 8-inch Gravity PVC Sewer Pipe with Class A Backfill, All Depths Linear Foot 102 Linear Foot 6 E 8-inch Gravity PVC Sewer Pipe with Class C Backfill, All Depths Linear Foot 590 Linear Foot 7 F 8-inch Gravity Restrained Joint DI Sewer Pipe with Class A Backfill, All Depths Linear Foot 123 Linear Foot 8 H Manholes Each 12 Each 9 I Inside Drop-Manhole Assembly Each 1 Each 10 J Anchor Blocks Each 4 Each 11 K Temporary AC Pavement Trench Restoration, 2-inches Thick Square Foot 2,400 Square Foot 12 L AC Pavement Trench Restoration Ton 85 Ton 13 M AC Pavement Grinding, 0 to 2-inches Thick Square Yard 1,900 Square Yard 14 N AC Pavement Overlay, 2-inches thick Ton 250 Ton 15 O Manhole Coatings Each 1 Each 16 P Traffic Control Lump Sum 1 Lump Sum 17 Q Temporary Rigid Signs Square Foot 140 Square Foot 18 R Temporary Sign Supports Each 5 Each 19 V Erosion Control Lump Sum 1 Lump Sum 20 W Shrubs Each 398 Each 21 X Trees Each 62 Each 22 Y Seeding Square Foot 5,400 Square Foot 23 Z Bark Mulch Cubic Yard 10 Cubic Yard 24 AA Three Year Planting Area Maintenance Program (Lump sum that covers all three years, not a per year value) Lump Sum 1 Lump Sum 25 BB Sidewalk Replacement, 4-inches thick Square Foot 120 Square Foot 26 CC Type "C" Curb Linear Foot 40 Linear Foot 27 DD Filling Abandoned Existing 8-inch Pipe Linear Foot 510 Linear Foot