Specifications include, but are not limited to: Place 1/4" 6.6M EHS Strand and associated hardware 1 LF; 2 Place 5/16" 11.2M EHS Strand and associated hardware 1 LF; 3 Place aerial cable and lash, first cable on bare strand, tag cable at each utility pole 1 LF; 4 Place aerial cable and overlash to existing cable and strand, tag cable at each utility pole 1 LF; 5 Place aerial fiber storage loop 1 LF; 6 Lash fiber-optic cable 1 LF; 7 Overlash fiber-optic cable 1 LF; 8 De-lash and re-lash cable 1 LF; 9 Install fiber-optic cable storage loop and associated hardware 1 LF; 10 Re-sag existing span 1 Per Span 11 Wreck-out existing aerial plant 1 LF; 12 Wreck-out existing aerial plant, de-lash, remove cable from bundle and strand, relash remaining bundle 1 LF; 13 Install down guy and associated hardware 1 EA; 14 Install screw anchor and thimble eye with associated hardware 1 EA; 15 Install expanding (bust) anchor and thimble eye with associated hardware 1 EA; 16 Install sidewalk anchor including post, guard, anchor, sidewalk arm if required, does not include sidewalk concrete restoration 1 EA; 17 Remove anchor and dispose 1 EA; 18 Sidewalk concrete restoration, per panel 1 EA; 19 Install copper ground bond, #6 copper wire 1 EA; 20 Install copper vertical ground, including rod, #6 copper wire, molding, to top communications attachment on utility pole 1 EA...