Flushing Existing Refrigerant Piping (lineset): Remove any remaining refrigerant and prepare the lines for new units. Setting New Evaporator and Condenser: Properly place and secure both the evaporator and condenser units. Replacement of Gobi II Pump: Install a new Gobi II pump in place of the existing unit. Connections: Refrigerant Piping: Connect the new units to the existing refrigerant lines. Drain Line: Connect and ensure proper drainage for condensate. Electrical Connections: Reconnect existing electrical lines to the new units. System Commissioning: Evacuate, pressure test the lines, commission, and fully test both mini-split units for operational compliance. Permits and Compliance: Secure and provide all necessary permits (if required by local regulations). Outstanding warranty.