Specifications include, but are not limited to: : Req. approx. 810 ft2 temp sign; 3 ea seq arr sign; 4 ea PCMS; 300 hr flag; 3 ea flag sta light; 3 ea AFAD; 2 ea temp impact atten; construct rem temp road; 400 yd2 plastic sheet; 226 ft sed fence; 12 ea inlet protect; 325 ft sed barr; 12 ton contam soil disp; 317 gal contam grndwater rem; 2 ea soil sample; const surv work; 20 yd3 gen exc; 3 yd3 stone emb; 63 ft pipe; 5 ea conc inet; 25 yd2 trench resurf; 189 ft3 elasto conc nosing; br rem work; 3,274 yd2 conc deck micro mill; 3,274 yd2 select hydrodemo; 22 yd3 struct exc; 22 yd3 gen struct backf; 2,932 yd2 surface texture; 64 yd2 reinf conc br appr slab; 228 yd3 struct conc overlay; 3,274 yd2 const struct conc overlay; 323 ft exp joint; 177 yd2 CPPR; 36 ton aggr base; 20 ton ACP; 305 ft conc curb; 1,516 ft2 conc surface; 40 ft det guide strip; 580 ft pvmt marking durable; refurb reinstall illum system; 358 yd2 seed; 15 yd3 soil conditioner; 238 ea shrub; 18 yd3 bark mulch; 11 ft hndrail; irrig sys.