The School Board of Palm Beach County, Florida invites Certified Roofing Contractors prequalified by the School Board pursuant to SREF Chapter 4.1 prior to the Bid Due Date to submit a Bid. To be eligible, the vendor must be prequalified for bonding capacity in the amount of the advertised Construction Budget or evidence bonding capacity in that amount prior to the Bid due date. The School District of Palm Beach County, Florida, will receive (via BidNet Direct @ www.bidnetdirect.com) sealed Bids for:
Project Name: Alexander W. Dreyfoos School of the Arts-ROOFING SERVICES
PROJECT ADDRESS: 501 S. Sapodilla Ave., WEST PALM BEACH, FL 33401
ITB NO.: 25-44h
PROJECT NO.: 0395-2304
BIDS SHOULD BE BASED UPON THE FOLLOWING DESCRIPTION OF WORK:
The project scope includes repair and renovation for the roofing of (3) existing buildings 6, 7 & 8 as noted below. Roof recovery & replacement varies by building area as shown below. The total roof area to be re-roofed is approximately 104,560 SQ.FT. See below for the scope breakdown per building. All work is to be completed per approved specifications and approved plans.
BUILDING 6 – AREA 6A: APPROX. ROOF AREA - 12,560 SQ. FT.
- Re-roof over existing roof using liquid applied membrane
- New flashings, drip edges, etc., replace gutters
- Building 6 – area 6b-6g: approx. Roof area - 16,300 sq. Ft.
- Replace roof (LWC to remain) w/ new modified bitumen 2-ply
- Existing MEP penetrations, repair and renovations
- Provide new gutters as shown
- New cants, copings, flashings, drip edges, etc.
- New expansion joints as required
- Replace overflow drainage bowls
- Provide roof ladder
BUILDING 7 - AREA 7K & 7N: APPROX. ROOF AREA – 9,600 SQ. FT.
- Re-roof over existing roof using liquid applied membrane
- Existing MEP penetrations, repair and renovations
- New cants, copings, flashings, drip edges, etc.
- New expansion joints as required
- Provide new gutters as shown
- Replace overflow drainage bowls
- Minor stucco repairs
- Exterior lights
BUILDING 7 – ALL AREAS EXCEPT AREA 7K & 7N: APPROX. ROOF AREA – 46,100 SQ. FT.
- Re-roof over existing roof w/ new modified bitumen 2-ply
- Existing MEP penetrations, repair and renovations
- New cants, copings, flashings, drip edges, etc.
- New expansion joints as required
- Replace overflow drainage bowls
- Provide new roof hatch & ladders
- Exterior lights
BUILDING 8 – ALL AREAS: APROX. ROOF AREA – 20,000 SQ. FT.
- Re-roof over existing roof w/ new modified bitumen 2-ply
- Existing MEP penetrations, repair and renovations
- New cants, copings, flashings, drip edges etc.
- New expansion joints as required
- Replace overflow drainage bowls
EXISTING LIGHTNING PROTECTION
- Remove and reinstall existing lightning protection (Refer to electrical drawings ELEC-CD-A-08.02.2024).
- All work to be completed per approved specifications and approved plans.
ATTACHMENTS
- ARCH-CD-C-10.02.2024
- ARCH-MOIST-RPT-A-08.02.2024
- ARCH-PULL-RPT-A-08.02.2024
- ELEC-CD-A-08.02.2024
- MECH-CD-A-08.02.2024
- PLUMB-CD-A-08.02.2024
- SPEC-CD-A-08.02.2024
- STRUC-CD-A-08.02.2024
- FL3915_R36_AE_2024_04_10_FINAL_NER-SOP-004_FL3915-R36
- PDS_AlsanRS_222_Primer_240110
- PDS_AlsanRS_260Lo_Field_240708
- PDS_AlsanRS_260Lo_Flash_240708
- PDS_AlsanRS_Fleece_230817
All work during the summer can be completed during the day or night. The schedule will still have to be worked out with the school as summer activities will be happening on-site. During the school year, work can be completed after the school day is completed but the schedule will have to be coordinated with school staff as there are activities at night. Holidays and weekends can be day or night work but still need to coordinate with school staff as activities are sometimes scheduled during these times.
The construction area or lay-down area will need fencing. Any damage to sidewalks and landscaping will need to be repaired.
ESTABLISHED PROJECT BUDGET FOR CONSTRUCTION: $2,400,000.00
PROCUREMENT SCHEDULE
MANDATORY SITE INSPECTION: FEBRUARY 20, 2025 at 9:00 A.M., EST
QUESTIONS DUE: FEBRUARY 25, 2025, NO LATER THAN 2:00 P.M., EST via BidNet Direct @ www.bidnetdirect.com
FINAL ADDENDUM ISSUED: MARCH 3, 2025 via BidNet Direct @ www.bidnetdirect.com
BIDS DUE: MARCH 10, 2025, NO LATER THAN 2:00 P.M., EST via BidNet Direct @ www.bidnetdirect.com
Each Bidder must attend a Mandatory Site Inspection at the project location to be eligible to submit a Bid. Site inspection will be held on FEBRUARY 20, 2025 as scheduled:
Alexander W. Dreyfoos School of the Arts-ROOFING SERVICES
501 S. Sapodilla Ave.,
WEST PALM BEACH, FL 33401
MEET IN FRONT OFFICE AND SIGN IN
DIRECTIONS: I-95 to Okeechobee Blvd., East to Tamarind Ave. Turn North on Tamarind to Fern St. Turn East on Fern to Parking Area. School is just north of the Kravis Center.