1. Replacement of concrete sidewalk, four (4) inches thick, per the construction detail including removal and disposal of the old concrete sidewalk, and miscellaneous excavation and a three (3) inch aggregate base and restoration, two coats of concrete sealing Alternate “A” as per the contract documents, complete in place S.F. 8,700 $____________ $_____________ 2. Replacement of concrete driveway, six (6) inches thick, per the construction detail including removal and disposal of the old concrete driveway, and miscellaneous excavation and a three (3) inch aggregate base and restoration, two coats of concrete sealing Alternate “A” as per the contract documents, complete in place S.F. 900 $____________ $_____________ 3. The replacement of rain conductor piping including the removal and disposal of the old rain conductor and miscellaneous excavation and connection to the existing rain conductor as per the contract documents, complete in place L.F. 250 $____________ $_____________ 4. Soil Erosion and sedimentation control including restoration of all disturbed areas including; restoration in kind of all disturbed shrubbery and other vegetation, restoration of all disturbed walls, landscaping, borders, etc., installing, controlling, maintaining and removing traffic controls and detours for the duration of the project as per the contract documents, complete in place L.S. 1 $