Specifications include, but are not limited to: The new ECCP and CHW TES facilities are planned as new freestanding facilities and interconnected to the existing campus chilled water system. The intent of this project is to develop an overall facility master plan along with anticipated total project costs, projected site development, and phased design and construction schedule. ; • Evaluate one or more potential locations for the new ECCP and TES complex. • Develop the program for a multi-level CCHW Plant facility that includes sufficient space for the three primary program areas: 1.) CCHW mechanical and electrical equipment o Lowest level for pumps and pipe gallery, walk-out to grade o Middle level for chillers, walk-out to grade o Cooling towers above on the roof level o Electrical equipment located where best fit 2.) Staff and support spaces o Control room, conference/training room, offices, work/shop room(s), break room, storage rooms, and restrooms with lockers o Operator’s Control Room with 2-3 workstations on the middle level 3.) TES tank(s) o Evaluate and develop the size, shape, materials, and elevation