Specifications include, but are not limited to: The Project consists of the design and construction of curb ramps at approximately 106 locations along CO 59/2 in Star City, US 19 in Westover, US 119 and WV 7 in Morgantown and WV 218 in Farmington to ensure ADA compliance. DOH intends to enter into a contract, which shall include but is not limited to: • Survey Services – no mapping will be supplied by the DOH • Right of Way Acquisition – All necessary plans and acquisition of right of way to construct the Project if deemed necessary • Project Services – preparation of construction plans as detailed in the Project Scope and shall include but are not limited to Design and Project Management; • Utility Coordination and Utility Relocation Services • Construction Services - necessary to build and ensure high quality workmanship of the designed facility