Specifications include, but are not limited to: Contractor shall remove existing flooring and wall base and replace with new flooring and wall base as specified. The scope of work shall include the following: Remove and site clear all existing flooring and wall base within the color shaded areas on the blueprints of the attached flooring manual. Prep and level if needed, concrete subfloor in these same areas to receive new flooring. Provide and install new flooring. All flooring shall be installed by qualified installers and all installations shall be per the manufactures recommendations and requirements. Provide and install 4-1/2” tall Vinyl wall base with standard color of owners choosing. Vinyl wall base shall be roll out style in order limit the number of seams. Provide any required permits. See manual for further work hour restrictions and specific instructions for each area. Contractor shall work consecutive workdays throughout the workweek once each area is started in order to limit the length of time and disruptions to county operations. Provide a minimum of one year warranty on labor and materials plus any additional manufactures warranties.