Specifications include, but are not limited to: In general, the work consists of: Double tee joint and shear/ diaphragm (connector) repairs throughout the facility estimated at 2,600 linear feet of joint replacement and approximate 100-150 shear connectors requiring, inspection, welding and/ or replacement. Expansion joint/ EM Seal repairs throughout the facility estimated at 325 linear feet of joint replacement. Repair South-East shear wall spalling and cracking on 3rd floor. Replacement of approximately 12,200 square feet of driveway membrane, primarily on level 4, and to a lesser extent on levels 2 and 3. This membrane shall be replaced through a multi-phased process. Repair 300 linear feet of Full Depth cracks in flanges and webs of double tees, primarily on the South side of Level 4. It also includes new guard rails on level 4 of the ramp. Please note that any striping required will be done by the Owner.