Specifications include, but are not limited to: Hutchinson Correctional Facility needs to install new a above ground diesel fuel storage tank at our Power Plant. The purpose of this tank is to provide available fuel to operate the steam boilers and generator. • Bidder will provide a new 6,000-gallon tank that meets all bid specifications. • Bidder will provide all new fittings and pipe for the tank. • Bidder will provide a crane to set the tank in place behind the Power Plant. • Bidder will provide a fuel pump sized for the current operation. • The tank supply and return lines will be tied into the existing lines that come into the tunnel area. All existing black pipe will be reused. • Once completed the fuel lines and operation of the system will be tested.