Specifications include, but are not limited to: Obtain/review existing ROW information and prepare necessary documents for ROW, PLE, and TLE acquisition in accordance with all local, state, and federal requirements for property acquisition. Land acquisition could potentially be required from approximately 6 parcels. In addition, Design Consultant shall have on their Team qualified individual(s) capable of providing services on behalf of the City for the acquisition/negotiation process. Design new urban road cross section. The total roadway width from face to face of curb is intended to be 57 feet. We anticipate the typical street section would include, four 11-foot-wide travel lanes, two 5-foot-wide paved bicycle lanes, 24-inch curb and gutter, and sidewalks throughout the 1,460- foot length of the project. Perform the necessary calculations and design for the new storm sewer necessary within the limits of the project. Ancillary improvements will include street lighting, pavement marking, and signage. Process must meet all of the requirements of the STP-Urban Federal Highway Program as administered by the Wisconsin Department of Transportation.