Specifications include, but are not limited to: Work to include curb and gutter, sidewalk repairs, and/or Bituminous Concrete milling and overlay. This work consists of providing temporary traffic control to maintain vehicular, bicycle, and pedestrian traffic through the project work zone. 202000 EXCAVATION AND EMBANKMENT CY 100; REMOVAL OF PORTLAND CEMENT CONCRETE PAVEMENT, CURB AND SY 1022 SIDEWALK; 211001; 211504 TREE REMOVAL, GREATER THAN 49" DIAMETER EACH 1; 301001 GABC CY 120; 301002 GABC, PATCHING CY 231; 401005 SUPERPAVE TYPE C, PG 64-22 (CARBONATE STONE) TON 4665; 401029 SUPERPAVE TYPE C, PG 64-22, PATCHING TON 275; 401030 SUPERPAVE TYPE B, PG 64-22, PATCHING TON 710; 401506 SPEED HUMP LF 104; 401755 RECYCLED ASPHALT PAVEMENT MILLINGS FOR ROADWAY EDGE TON 25; 402000 BITUMINOUS CONCRETE PATCHING SYIN 14980;