Specifications include, but are not limited to: replacing approximately 33,500 SF of roofing on the lower roof areas of Gordon Hall. Existing ballasted EPDM roofing system will be torn off down to existing roof deck. The new roofing system will be fully adhered EPDM over new tapered insulation with sumps at scuppers and drains to provide adequate drainage. New metal scupper boxes and downspouts will be installed for the entire lower roof area. Work will be coordinated around existing equipment curbs and other roof penetrations. All metal counter flashings and metal roof edges will be replaced. The project also includes replacing the flashings around all plumbing vents on the upper roof areas as requested by DHS as well as closing two penetrations on the upper roof areas where abandoned incinerator stacks will be removed by owner.