Specifications include, but are not limited to: A. Pour a new foundation pad to support a generator and transfer switch. B. The foundation should be a minimum of 4 inches thick and extend 3 feet around the equipment. C. Trench from generator pad to building, measurements to be determined by contractor at bid-walk and verified after award of contract. D. Install a new 25KW natural gas-powered generator. E. Install a new transfer switch. F. Connect generator to natural gas line. Ensure all connections are sealed. G. Connect building to generator and ensure proper operations. H. Program generator and equipment to provide automatic power in the event of power loss. I. Maintain a safe working environment to prevent injuries to CHP personnel or damage to CHP property. J. Contractor, at no expense to the State of California, will repair any damage caused by the contractor or any of his/her workers.