Specifications include, but are not limited to: the work consists of This project will demolish the existing Cliffwood Campground Toilet Shower Building (originally built in 1971) and replace it with a new toilet shower building at its current location. The new building will improve ADA access to the shower and toilet elements and improve the maintainability and functionality of the building. The project will also include water infrastructure, septic system upgrades, campsite electrical panel relocation, demolition of two vault toilets and construction of one new vault toilet, new host campsite with full hookup for water, sewer and power, site parking for six stalls plus two ADA stalls, and reconstruction of walking paths to improve ADA access to campground areas including access to the 7 new toilet shower building.