Specifications include, but are not limited to: Furnish all labor, material, equipment and tools of the trade to patch, and install bituminous concrete (asphalt), crack fill, seal coat and parking stall restriping as directed by the University. All work shall include all necessary surface preparation, including but not limited to, cleaning surfaces, and adjusting manholes, valve boxes and inlets. In addition, contractor will provide a parking lot assessment for all UW Oshkosh parking lot. 6.2.1 Sequence of operations or place of commencement may be determined by the University as deemed to best serve the needs and convenience of the University, or as necessity of occasion requires. 6.2.2 Contractor must hold the appropriate licenses, certifications, and/or other professional credentials required by federal, state, and local laws to perform these services. 6.2.3 Must comply with all federal, state and municipal laws and ordinances. The contractor is solely responsible to prepare all documents, give all notices, obtain all permits, obtain all certificates and approval of work, and all other related costs to complete the service at no additional cost to the University. 6.2.4 The Contractor must use new product recently purchased and with sufficient shelf life to perform this work. The University reserves the right to request invoicing, age verification of product, and contact with suppliers to ensure the products utilized were not expired or not recommended for use. 6.2.5 Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits. 6.2.6 Interference with, or inconvenience to University operations shall be kept to a minimum. All required exits, doors, passageways and walks are to be kept in an unobstructed manner at all times.