Specifications include, but are not limited to: Bid Item 3001 – Pavement Crack Repair – Palmer Park Tennis Courts #1-6 This work consists of cleaning, preparing, and filling expansions joints and surface cracks. Remove all previous crack repair materials that are loose or not well bonded to the court, including all existing rubberized crack filler material. The pre-approved crack repair system for this project is RITEWAY Tru-Bounce Crack Repair. The RiteWay Crack Repair system is a patented system designed to cover bituminous pavement structural cracks. The RiteWay Crack Repair System must be installed by certified RiteWay contractors. Submittal of manufacturer’s certification is required. Apply RiteWay Tru-Bounce Crack Repair to approximately five hundred and fifty feet (550’) of playing surface cracks. Additionally, apply RiteWay Repair to approximately four hundred and eighty feet (480’) of expansion joints between courts and three hundred and ten feet (310’) of expansion joints underneath the net area.