Specifications include, but are not limited to: 1. Roof System Removal: The existing building roofing system and flashings shall be completely removed to the original decking and legally disposed. The removal of the existing roof systems shall be coordinated with the installation of the new roof to prevent exposure to weather conditions and potential water infiltration into the buildings. Design documents shall identify all requirements for safety devices, need for chutes and/or cranes for roof material removal, dumpster location, protection from exposure to the weather, protection of property and personnel, building access routes and circulation patterns, contractor use of the premises, parking, security procedures, equipment and materials storage, waste disposal, etc. 2. New Roofing System: The Consultant shall provide the design and specifications for a new Cedar shingle roofing system that closely matches the existing roof and meets the Historic Preservation Office Approval. Review all roof mounted equipment or features including roof exhausts, flashing, plumbing vents, antennas, electrical connections or devices and any other roof related materials and provide for the removal and/or replacement per client request or reinstallation of those items in the design documents. 3. Roof Leaders, Gutters and Fascia: The Consultant shall investigate and determine if the existing roof leaders, gutters and fascia are sound or in need of repairs and provide the design and specifications for the repairs that are recommended.