Specifications include, but are not limited to: install green infrastructure and other site improvements under I-94 at W. Becher Street. The work includes, but is not limited to, site grading and finishing, installation of dry stream beds, bio-retention, an asphalt maintenance pathway, native vegetation, bioswales, and trees. Using PVC pipe, the contractor will connect 18 freeway downspouts to the green infrastructure. A Freeway Drainage Collection Feature is an alternative bid item. Major components of the work include: • 4,089 Cubic Yards Excavation for Pathway, Streambeds and Bioretention Basin • 599 Cubic Yards Crushed Aggregate Base Course • 158 Cubic Yards Bituminous Concrete (HMA Pavement) • 694 Cubic Yards Stone Mulch Finish • 130 Each Tree – Deciduous, 1.5” Caliper Container with 2-year Warranty • 843 Cubic Yards Compost (Soil Amendment)