Specifications include, but are not limited to: The City is seeking proposals from experienced and qualified Delaware licensed Water Well Contractors for entering into an agreement to inspect and assess the condition of all well pumps, pump motors and controls, pump shafts, well pump piping, well casings and well screens at twenty-one (21) production well sites (6 deep production wells in the Piney Point Aquifer, 9 deep production wells in the Cheswold Aquifer and 6 shallow production wells in the Columbia Aquifer). These wells are identified by their Well Identification Number in Appendix A. A report detailing the inspections and assessment of each well, including all testing data as well as recommended actions and/or needed repairs, must be provided to the City before authorization of repairs. A Preliminary Inspection Report with pre-corrective action test data and a Final Inspection Report with post-corrective action test data will be required by the City. The City reserves the right to authorize any minor repairs deemed cost effective to occur during inspection of the well. Upon completion of the inspection, assessment and any additionally authorized work, the production wells must be placed back into a fully operational state, and all areas of the site restored to their original condition. No site work is involved, other than site restoration to original conditions.