Specifications include, but are not limited to: In general the work consists of replacing two hydraulic kitchen service elevators at the Blackhawk Commons Building at UW Oshkosh. The work includes complete removal and disposal of original elevator equipment, cabs, and controls; and installation of new power units (pumps, motors, valves, oil), elevator cabs, car and hoist way doors, controls with fire services, three-phase disconnect switch, and underground jack assemblies. Project work will also include re-drilling for jack assemblies as required. A new fire alarm and smoke detection system will be installed in the machine room to meet current life safety codes. The machine room HVAC system will also be modified and augmented as necessary to satisfy the equipment warranty.