Specifications include, but are not limited to: Work under this contract shall consist of removing one (1) concrete manhole, approximately 15 LF of 60-inch Brick storm sewer pipe, approximately 23 LF of 60-inch Corrugated Metal Pipe (CMP), installing one (1) 6’x8’ concrete diversion structure, one (1) 8’x8’x30’ concrete grit chamber with baffles, 30 LF of 18-inch HDPE pipe, seven (7) precast manholes rises, site restoration including reinforced turf, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. Also included are three (3) alternatives for asphalt trail paving, geogrid reinforcement in access area and poured-in place sloped concrete floor in the grit chamber.