In Bldg 35 and Bldg 5010 remove and replace the existing Uninterruptable Power Supply (UPS). Electrical work will be required as part of the replacement. In both buildings there will need to be installed a new supply circuit to the UPS. This circuit will require a new breaker, conduit, wiring and associated fittings. The existing supply panel will accomodate the new circuit in both cases. On the output of the UPSs a new circuit (conduit, wiring and associated fittings) will be required and will connect the UPS to a new Output power panel. All existing loads on the existing panel will need to be relocated to the new output panel. Demolition of the old input circuit and the output circuit and output panel are required as part of this project. For more details refer to the Statement of Work and associated drawings.
4 JUNE 2023: Acknowledge Solicitation Amendment W50S7X-23-B-0002-0001, dated 3 June 2023 For Wage Determination Update and see current attached: KS20230057 (Sedgwick) Mod 05 6-2-2023, & KS20230045 (Saline) Mod 04 5-26-2023.