This is a combined synopsis/solicitation for non-commercial items prepared in accordance with the format in FAR Part 36, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and no other written solicitation will not be issued.
Instructions to offerors, (FAR Part 36) evaluation criteria, and all applicable FAR Provisions and Clauses are attached.
The solicitation number is 70Z02923QNEWO0028 and is issued as a Request for Quotation (RFQ).
The solicitation document and incorporated provisions and clauses.
Federal Acquisition Regulation (FAR) Clauses and Department of Labor Wage Rates for Construction are included in this order and are applicable.
Where Federal Acquisition Regulation clause language is inconsistent with FAR Part 36, Legal Effect of Quotations, that language is hereby tailored in accordance with FAR Part 36 to be consistent with a request for quotations. This tailoring includes but is not limited to the following: In accordance with FAR Part 36, a quotation is not an offer, and any clause provision to the contrary is hereby modified to be consistent with FAR Part 36. Where the word "offer/offeror" or a derivative of that word appears, it is changed to "quote/quoter" or a derivative of that word.
This is a small business set aside, the applicable NAICS code is 238210 and small business size standard is $16.5M.
This solicitation will result in a Firm-Fixed Price Construction Contract awarded to the offeror with the Lowest Price. Offerors must be actively registered in System for Award Management - https://www.sam.gov
The USCGC KICKAPOO has a requirement to replace a UPH transfer switch. Contractor shall provide all labor, materials, and equipment necessary to complete the following unless noted below: Below, work will be completed onboard USCGC KICKAPOO UPH Building. Contractor shall protect all equipment and merchandise in work location. Existing transfer switch information: Voltage: 480/ Phase: 3/ AMPs: 400/ . Contractor shall remove old transfer switch. Contractor shall install the new transfer switch as per the manufacture recommendation. Contractor shall test the new transfer switch after instillation, while the Coast Guard COR is present. Contractor shall conduct training on the new transfer switch.Contractor shall clean-up the work site and dispose of trash.
Please see the attached Performance Work Statement for specifications.
30 DAY ARO
FOB Destination to:
USCGC KICKAPOO
225 Coast Guard Rd
Vicksburg, MS 39180
FAR 52.237-1 -- Site Visit (Apr 1984). Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
The Government Point of Contact (POC) for this work is MKC Joe Blume via telephone at (601)636 - 8304 and/or via e-mail at Joseph.M.Blume@uscg.mil
All quotes are due at by 3:00pm CST on August 4,2023. Submit quotes to the following e-mail address: Jaleesa.n.vaval@uscg.mil Any and all questions regarding this solicitation shall be submitted in writing to the Lead Purchasing Agent at Jaleesa.n.vaval@uscg.mil no later than August 4, 2023, 3:00pm CST or the question may not be answered.