03/26/2024: Amendment 0004 has been issued to correct the ADDENDUM to FAR 52.212-1 Instructions to Offerors. See the attached ADDENDUM and Solicitation Questions Answers and Changes thru Amendment 0004 for further details.
**************************************************************************************************************************************************
03/22/2024: Amendment 0003 has been issued to add the ADDENDUM to FAR 52.212-1 Instructions to Offerors - Commercial Products and Commercial Services which was inadvertently left out of the solicitation. See the attached addendum for further details.
***************************************************************************************************************************************************
03/13/24: Amendment 0002 has been issued to address questions and answers to the solicitation and extend the deadline for all offers to 03/20/2024. See 36C25624Q0351 0002 Amemdment 2 for futher details.
***************************************************************************************************************************************************
03/07/24: Amendment 0001 has been issued to address questions and answers to the solicitation. See 36C25624Q0351 0001 for further details.
***************************************************************************************************************************************************
The Veterans Healthcare System of the Ozarks (VHSO) has one Uninterruptible Power Supply System in use on 24/7 basis. The GE Uninterruptible Power Supply System MODEL LP33-100KVA is in Building 01-Room 034 which serves OI&T Network. (VHSO), located at 1100 N. College Ave., Fayetteville, AR 72703.
The purpose of this Performance Work Statement (PWS) is to procure services for Uninterruptible Power Supply Replacement in support of VHSO operations.
The Contractor must furnish all labor, material, equipment, supplies, transportation, management and supervision necessary to perform de-installation and disposal of the current UPS system, and installation of the new UPS system as outlined in this Performance Work Statement (PWS). Materials supplied by the Contractor must be of a quality to conform to applicable Federal and State specifications.
All equipment shall be maintained to operate in a correct and safe manner as intended and designed by the Original Equipment Manufacturer (OEM).
Contractor shall ensure new UPS System and any related equipment will fit in area of previous UPS System.