The scope of work is to remove the jacketing and insulation from around Boiler 3, clean the vessel surface, and perform NDT/NDE to verify and certify the structural integrity of the boiler vessel. Afterwards, if the structural integrity is satisfactory; the insulation and jacketing is to be replaced and the boiler put back in service with a full combustion check and tuning as well as operational and safety inspections. The Contractor shall provide a proposal for the work split into two portions in accordance with this conditional scenario. See Performance Work Statement (PWS) for additional information.
Technical questions are due by 6 March 2024 by 11:00 AM CST.
Answers to questions will be available by 8 March 2024 at 11:00 AM CST.
Quotations are due by 14 March 2024 at 11:00 AM CST.
***AMENDMENT 0003***
This amendment is to incorporate the Questions and Answers as well as a visual description of the boiler, and to remove the Site Visit MFR and NCIC Screening and Pass Request from the current version of this solicitaiton. Amendment date 7 March 2024.
***AMENDMENT 0002***
This amendment is to incorporate additional requirements in the Performance Work Statement (PWS). Please see the PWS for additional information. Amendment date 29 February 2024.
***AMENDMENT 0001***
A site visit is being incorporated. The site visit is scheduled for 05 March 2024 at 1:00 PM CST on the East side of Bldg 304. Refer to Page 1 of "FA460024Q0009 Combo Solicitation". For contractors requiring access to Offutt AFB, please fill out the "NCIC Screening and Pass Request" and e-mail to SSgt Patrick Pinault at patrick.pinault@us.af.mil and SrA Justin Smith at justin.smith.216@us.af.mil.