Awarded-- Rusty Bucket Construction
See attached Award notification for the particulars
7/15/2024 Amended Solicitation submittal date:and added questions and answers
Submittal date extended from 7/12/2024 to 7/29/2024 at 12:00 pm
7/15/20246/28/2023--Added specifications_summary of work attachment
The Contractor shall be responsible for furnishing all labor, equipment, transportation,
and specified materials/supplies necessary to complete the replacment of two (2)
underground water system control valves, one (1) 4” backflow preventer assembly, two
(2) electric heaters, two (2) roof penetration boots, one (1) propane shut-off valve, one
(1) electric incinerating toilet, and one (1) ¾” PEX water line (approximatly 3” in length).
The contractor is also responsible for furnishing all labor, equipment, transportation, and
specified materials/supplies necessary to complete the following new improvements. One
(1) French Drain (21’L x 2’W x 2.5’D) and associated underground 4” drainage culvert
(approximatly 65 L.F.), one (1) 120v, 15 amp circuit with quadplex outlet installed on
existing steel lookout tower (intended outlet location is approximatly 100’ above ground
level)
The Contractor shall be responsible for furnishing all labor, equipment, transportation,
and specified materials/supplies necessary to complete the repair/replacement of the
existing 4” sanitary sewer at Big Springs Work Center (Bid Items #9 and #9A). The intent
of this contract is to either clear the blocked sewer line using non-destrictive methods or
to completely replace the blocked section of sewer (damaged sections of sewer line shall
not be left in-place without adaquate repair to fully restore integrity of sewer pipe).
Contractor will be responsible for investigating the nature of the blockage, and
determining the appropriate course of action to bring the blocked sewer into full working
order. If the sewer pipe is found to be physically compromised, then replacment of the
compromised section will be requiered. Only one of the two bid items, #9 and #9A will
be paid. Contractor is responsible for coordinating with COR during the process to elect
which bid item will be necessary for successful repair of the sanitary sewer