Amendment 00002 posted on 08/08/2024 to post Pre-Bid RFI Log dated 08/08/2024
Site Photos posted on 8/5/2024.
Final RF Log is posted on 7/29/2024 as well as notes and attendance from the site visit.
RFI Log is updated on 7/24/2024.
Amendment 00001 is posted on 7/18/2024.
The purpose of this amendment is to add the following attachments.
9 EXHIBIT A breakdown example
10 TEMPLATE - Document Tracking Log
11 Pre-Bid RFI Log-P20221008080 07182024
This amendment also adds an RFI final due date of 2 PM on July 25th 2024.
The work of this project is to replace the existing copper water piping system and related components in Building
110 at the CDC’s Chamblee Campus. This replacement and installation consists of, but is not limited to, the
following aspects:
1) Perform phased work as approved by CDC to install parallel CPVC water lines and systems in interstitial floors.
a. Construct a separate riser system as shown on the drawings.
b. Install new ball valves to isolate systems and fixtures as shown on the drawings.
c. Install replacement equipment as shown on the drawings.
d. Perform switch over to new systems as approved by the CDC.
e. Provide as built documents for project as defined in Section 01 70 00.
The full scope of work is found within the attached Statement of Work, Specifications, and Drawings.