THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs. Interested businesses must submit the following by e-mail to CFLAcquisitions@dot.gov (Attn: Laura Vallejos) for receipt by close of business (2 p.m. local Denver time) on July 16, 2024:
(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;
(2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business;
(3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $10 million, and your firm’s aggregate bonding capacity; and
(4) Provide a list of road construction projects of equal or greater value and scope to the NV FLAP 500(1) Red Rock Trail project in which you performed roadway and trail construction including installation of pedestrian bridge. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.
The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/
PROJECT DESCRIPTION: The Red Rock Trail project is in Las Vegas, Nevada in the outskirts of Summerlin and into the entrance of Red Rock Conservation Area. This project includes construction of a multi-use trail and pedestrian bridge along with reconstruction of State Highway 159 widening.
SCOPE OF THE WORK: The project is located adjacent to the Red Rock Conservation Area which is a highly environmentally sensitive area. It includes construction of approximately 1 mile of paved multi-use trail, widening of State Highway 159 for additional turn lane width and construction of a 210-foot pedestrian bridge with drilled shafts. The project includes multiple Partners with Bureau of Land Management, Nevada Department of Transportation and Clark County Public Works. The project will be broken up into a Schedule A and an Option X. Schedule A includes all the trail and bridge. Option X includes work related to State Highway 159.
PRINCIPAL WORK ITEMS:
Schedule A:
Embankment construction – 6,000 CUYD
Riprap, Class 7 – 1,400 CUYD
Roadway aggregate – 2,000 TON
Asphalt concrete pavement – 1,400 TON
Precast, Prestressed concrete box beam – 820 LNFT
Drilled shaft – 260 LNFT
Option X:
Roadway aggregate – 800 TON
Asphalt concrete pavement – 2,100 TON
ANTICIPATED SCHEDULE:
Advertisement – August 2024
Award – November 2024
Construction Start – December 2024
Construction Finish – December 2025
The estimated price range of the project work is between $5,000,000 and $10,000,000.