FY24 Myrtle Beach Emergency Renourishment - The work consists of placing approximately 600,000 cubic yards of dredged material on North Myrtle Beach (Reach 1), 850,000 cubic yards on Myrtle Beach (Reach 2), and 600,000 cubic yards on Garden City/Surfside Beach (Reach 3). Suitable borrow material will be dredged from three (3) offshore borrow areas. The work includes before and after surveys of the beach areas and monitoring structures adjacent to Myrtle Beach during construction. The work includes dune fencing and signage work. The work includes complying with the requirements of the Endangered Species Act and Marine Mammals Protection Act. NOTE: In accordance with Executive Order 14063, a Project Labor Agreement (PLA) will be required for the subject requirement. In accordance with FAR clause 52.222.34, the Offeror who submitted the lowest priced bid will be required to submit a PLA. North American Industry Classification System (NAICS) Code: 237990 Other Heavy and Civil Engineering Construction. This solicitation is hereby posted as of July 18,2024. The purpose of Amendment 0001 is to provide Survey data. This Amendment is hereby posted as of 7 August 2024. The purpose of this Amendment 0002 is to delete some language in Section 35 20 25 see Amendment for details. This Amendment is hereby posted as of 12 August 2024. The purpose of Amendment 0003 is to provide Beach Survey Data. This Amendment is hereby posted as of 14 August 2024. The purpose of Amendment 0004 is to add a FAR clause and change some language in Section 35 20 25 please see Summary of Changes for Details. This Amendment is hereby posted as of 15 August 2024.
Bid Opening Abstract is hereby posted as of 22 August 2024.
Revised Bid Opening Abstract- IGE is hereby posted as of 26 August 2024.