** AMENDMENT #3 issued on 8/21/2024 -- the purpose of this amendment is to add information to page 3 of the R10 Typical Drawings document. Please provide a signed copy of this amendment when submitting a proposal.
** AMENDMENT #2 issued on 8/14/2024 -- the window for questions has closed. See all answered questions attached to the 2nd Amendment document, 12048924R0041_0002. When submitting a proposal, please provide a signed copy of both Amendment documents.
** AMENDMENT #1 issued on 8/7/2024 -- R10 Typical Drawing (Attachment 1) contains incorrect measurements for Bridge Clear Width. Please see the updated version of the document labeled "Amended R10 Typical Drawing" with highlighted changes. Also, when submitting a proposal, please provide a signed copy of the Amendment document.
** Send all questions to Maggie Fowler at margaret.fowler@usda.gov no later than 5:00pm EST on 8/13/2024.
The Chugach National Forest requests engineering and fabrication services for the design, fabrication, and delivery of the Heney Ridge FRP Trail Bridge. The Contractor shall furnish all work required to complete the design, fabrication, and delivery of the project within limits of acceptable engineering practice with the drawings and specifications, and in accordance with the provisions of the contract.
This project is to provide and deliver the Forest Service with an engineered FRP superstructure that will be installed by the Forest Service in a backcountry location. Delivery will be to Cordova Ranger Station, located in Cordova Alaska. The superstructure may be sourced from a manufacturer, provided the requirements are met.