Repair, renovate, and install equipment at seven warehouses (totaling approximately 39,000 sq ft) and admin facilities (totaling approximately 6,711 sq ft) located at the Davis-Monthan Air Force Base, in Tucson, Arizona. The warehouses were constructed with corrugated siding and roofs.
The general scope includes installing warehouse support equipment, replacing associated utility infrastructure, and revamping truck receiving/transportation flow. The construction performance period is estimated at 18 months.
The specific scope includes, but is not limited to:
a. Remodeling two admin facilities to include all interior finishings, bathrooms, utilities, windows, and ADA doors.
b. Remove/replace all existing items within the warehouses (lighting, pallet racks, fire alarm, electrical).
c. Repair/level and diamond polish concrete slabs, concrete joints, interior support structure, and paint walls and remove/replace warehouse siding and roofs.
d. Install warehouse items (i.e., electrical service, CCTV camaras, warehouse equipment and pallet racking, forklift battery charging stations, and HVAC)
e. Traffic control and monitoring systems (proximity sensors and CCTV intersection camera, powered entry/exit gates, Radiation Detection Monitor, and over-head canopy structure)
f. Add and repair pavements and security fencing.