See attached solicitation, statement of work, drawings, and specifications.
Send all base access request to both TSgt Morelock and SSgt Phipps.
6 August 2024: Solicitation Amended for a date correction for bid opening 05 September 2024.
8 August 2024: Solicitation Amendment SF 30 Posted; Drawings and Specifications added to solicitation separately.
9 August 2024: Solicitation Amendment SF 30 Posted.
13 August 2024: Site Visit Minutes, Slides, and sign in sheet added. Solicitation Amendment SF 30 Posted. Updated Solicitation posted.
20 August 2024: Bid Questions with answers posted. Specification section for LED Display for Front Gate Marquee Project and revised drawing sheets C2.1, A3.1, A3.2, A3.3 (New Sheet) and photographs of building 132 Electrical posted. (12 new documents total)
21 August 2024: Solicitation Amendment SF 30 Posted to reflect changes in drawings and specifications, questions and answers can be found in section 00 73 00. As well as revisions to sections 00 10 00, 00 21 00, 00 45 00, and 00 70 00, of the solicitation.
4 September 2024: Bid questions with answers updated. See previous attached revised drawings and specifications for clarifications.
12 September 2024: Abstract (OF1419) and bid opening sign in sheet posted.