Amendment 0001- Time for site visit added, 1200 AKDT
A site visit will be conducted on August 21, 2024 at 1200 AKDT . If you would like to participate in the site visit please provide full name, birthday, last 4 of SSN, and drivers lisense number by August 16, 2024.
The contractor shall provide all personnel, labor, equipment, supervision and tools necessary IAW UFC 3-230-1, Change 1, WATER TREATMENT; AFMAN 32-1072, WATER-WELL DRILLING OPERATIONS; ANSI/AWWA Standard A100-20, WATER WELLS; 18 AAC 80, DRINKING WATER, Alaska Drinking Water Regulations or any other applicable military, state, federal and environmental regulations or industry standards not mentioned herein this document to Inspect Well F, Bldg 3427 at the EAFB Water Treatment Facility. The end goal of this project is to ensure the government knows the current condition of the well casing, screen, down pipe any other pertinent equipment or structures necessary for Well F that would enable the government to determine if further
investment is warranted
The contractor shall provide all personnel, labor, equipment, supervision and tools necessary IAW UFC 3-230-1, Change 1, WATER TREATMENT; AFMAN 32-1072, WATER-WELL DRILLING OPERATIONS; ANSI/AWWA Standard A100-20, WATER WELLS; 18 AAC 80, DRINKING WATER, Alaska Drinking Water Regulations or any other applicable military, state, federal and environmental regulations or industry standards not mentioned herein this document to Inspect Well B, Bldg 3430 at the EAFB Water Treatment Facility. The end goal of this project is to ensure the government knows the current condition of the well casing, screen, down pipe any other pertinent equipment or structures necessary for Well B that would enable the government to determine if further investment is warranted. This would be based off information gathered from the closed-circuit video inspection of the parts of the well deemed necessary for its proper operation.