This contract is for the furnishing, hauling and placement of South Dakota Class B riprap at four (4) designated locations on and near the dam as described in the Specifications and shown on the Drawings. Before the riprap is to be placed, minor excavation of the identified streambed and head-cut areas described in the Specifications and shown on the Drawings will occur and drainage fabric will be placed according to the Specifications and shown on the Drawings. Additional South Dakota Class B riprap will be stockpiled at a location designated by the Government. After all ground disturbance activities have been completed, seeding and the placement of erosion control materials as described in the Specifications and shown on the Drawings will be the responsibility of the contractor.
Work for the Lower Booth Dam Riprap project consists of the following:
-
-
-
- Furnish, haul, and place South Dakota Class B ripap at four (4) designated locations on and near the dam as described in the Specifications and Shown on the Drawings.
- Furnish and place Type B Drainage Fabric under the riprap as described in the Specifications and Shown on the Drawings.
- Additional South Dakota Class B riprap will be stockpiled at a location designated by the Government.
- Excavate the streambed and head-cut areas as described in the Specifications and Shown on the Drawings.
- Seed and place erosion control materials at locations as described in the Specifications.