See attached solicitation, drawings, specifications, and statements of work.
Send all base access requests to TSgt Morelock and SSgt Phipps.
Instructions for site visit on 30 August 2024 at 2 PM can be found in section 00 21 00 of the solicitation.
02 September 2024: SIte visit minutes, site visit sign in sheet, site visit pre-bid slides added.
8 September 2024: Bid questions with answers posted.
25 September 2024: Bid Questions with answers posted. Revised specification C1-1 posted. Solicitation Amendment SF 30 Posted to reflect revision and incorporate questions and answers.
26 September 2024: Abstract (OF1419) and bid opening sign in sheet posted.
27 September 2024: Abstract (OF 1419) reposted to correct glitch in previous form.