Calibration gases are required to continuously operate the CEMS System. The SOW requires the following:
• Calibration gases
- Contactor shall provide six bottled gases with a certification of batch analysis label attached to each cylinder to building 11 north loading dock as needed.
- Contractor shall move all delivered cylinders to the designated storage rack located in Building 11 West of Boiler 5 Ground floor
- Each cylinder shall comply with the following requirements:
- Environmental Protection Agency (EPA) Protocol
- Impurities verified against analytical standards traceable to National Institutes of Standards and Technology by weight and/or analysis.
- List the following attributes in Certificate of Batch Analysis
- Part Number
- Laboratory
- Analysis Date
- Lot Number
- Reference Number
- Cylinder Volume
- Cylinder Pressure
- Valve Outlet
- Expiration Date
- Gas Components
- Requested Purity
- Certified Concentration
- Protocol Method
Additional details can be found in attached Combined Synopsis/Solicitaion and Statement of Work.
Please use attached Bid Sheet to submit pricing.