Am-0004 - Updated Wage Determination, revised proposal due date, and proposal acceptance period // Am-0003 - Revised Specs/Drawing and updated DIV 21/22 // Am-0002 - Extend proposal due date to 27 NOVEMBER 2024 // Am-0001 - Extend proposal due date to 31 OCTOBER 2024 // The F. E. Warren Geothermal Generation Project is a comprehensive initiative aimed at exploring and characterizing the presence and productivity of geothermal resources at F. E. Warren AFB, east of Cheyenne, Wyoming. The project involves drilling a geothermal well to measure the thickness and test the properties of the Hartville Formation and the underlying formations, such as the Guernsey, Flathead, and Pre-Cambrian Formations. The drilling is planned to reach a maximum measured depth of 14,000 feet. The conceptual design of the well aims to comprehensively measure the temperature, pressure, and productivity of the formations, with a particular focus on the Hartville Formation.