The contractor is responsible for providing specifications, shop drawings and field verify all site conditions,dimensions and other factors which may affect the work. The contractor will provide all tools, materials,equipment, labor, and items as needed to properly get the breathing air system operational and tested forimmediate use to include but limited to the following: Labor will consist of running all new pipe fromcompressor, filters, tank and breathing air package, removing all old gauge packages and regulator, Connectingnew regulator to CO Monitor, Connecting (1) gauge Package and safety valve in pipe run after Breathing airpackage, and Providing an acceptable test for leaks and operation of breathing air package followinginstallation.