**AMENDMENT 1**
The purpose of this amendment is to attach the diagram as referenced by paragraph 2.1 of the SOW dated 7 Aug 24. See attachment titled: "COB 2nd Floor (Dimensioned).
Please acknowlegde this amendment when submiting a proposal.
**ORIGINAL POST**
The contractor shall provide all labor, equipment, tools, and supplies necessary to accomplish the work IAW the SOW dated 7 Aug 24. The SOW defines the effort required by the contractor for installation of shielded RF cables and conduit in building 38(COB) to enable new radio system ground system in support of B-2 operations. The Contractor shall provide for Whiteman AFB, MO and install a conduit to shield RF cables that run form the room G202(ACS lab) patch panel to the roof cabinet of the building 38 (COB). All equipment must be able to be removed off site immediately if necessary, and removed at the end of the day, at a minimum. Contractor shall be prepared to begin work immediately on the contract start date.